estimating desk / la vergne, tn

bid with the whole scope.price every line before the first cut.

Itemized material and labor takeoffs, shaped into ready-to-send quotes for remodelers and small general contractors. A steadier number before the work begins.

Send over a plan set

measured and assembled in la vergne, tn

Marked remodeling plans, a brass scale ruler, and estimate sheets on a worktable plan → quantity → bidtakeoff file / 001

the takeoff / scopes

A clearer read on the work.

From a single room to a full interior renovation, the estimate starts with what is actually on the drawings—quantities, labor lines, and the details that deserve a second look.

SCOPE_01

interior remodels

Room-by-room quantities for framing, board, finish materials, and the labor tied to each scope.

SCOPE_02

kitchens & baths

Cabinet, tile, fixture, and finish quantities organized around the room.

SCOPE_03

additions & build-backs

Separate existing conditions from new work, so the bid reflects the actual scope.

SCOPE_04

trade-by-trade takeoffs

Need a defined piece of the estimate? Keep the quantities and assumptions together by trade.

sample sheets / illustrative only

The shape of a useful estimate.

These are illustrative scope sheets, not client projects. Each shows the kind of structure a contractor can use to review quantities, check assumptions, and build a bid.

example / 01

kitchen refresh

Cabinet, counter, backsplash, and finish allowances separated by room scope.

example / 02

bathroom rebuild

Tile surfaces and fixture counts made legible beside the labor lines.

example / 03

interior renovation

Trade-separated quantities and notes for a broader, multi-room scope.

03 illustrative scope sheets on this page

the working sequence

From drawing set to a number you can send.

Clear inputs make for a cleaner estimate. The notes stay close to the quantities, so you can see what shaped the bid.

01 / receive

Share the plans and scope.

Send the drawings, any finish selections you have, and the deadline you are working toward. Flag the areas that need careful attention.

02 / measure

Quantities get checked against the sheets.

Materials and labor are organized by scope. Unclear details are called out as assumptions or questions rather than quietly guessed.

03 / prepare

Review a bid-ready breakdown.

Receive the itemized takeoff and quote in a format you can review, adjust, and send from your own estimating desk.

inside the packet

Every line has a place.

A bid is easier to stand behind when the quantities and the thinking behind them are easy to find.

sheet / quantities

Materials, counted to the plan.

Itemized quantities sit beside the relevant scope, so a quick review does not turn into a second takeoff.

sheet / bid notes

Labor lines, assumptions, and exclusions.

Keep the decision-making visible: what is included, what needs confirmation, and what sits outside the quoted scope.

per-project estimating

Choose the depth the plans call for.

Fixed starting prices for clearly defined estimating work. If the plan set or scope calls for more, confirm the fee before the estimate begins.

defined scope / entry

single-scope takeoff

For one trade or a contained piece of a remodel when you need the quantities laid out cleanly.

$285 per project
  • Itemized material quantities
  • Plan notes and scope questions
  • One defined trade or work area
Ask about a takeoff

Fees are per project estimate; confirm scope and price before work begins.

your estimating desk / la vergne, tn

Put the plans on the table.

Tell us what you are pricing and when you need it. Share the scope first; we will confirm the fit and fee before starting the takeoff.

send an estimate enquiry

Price a plan set Call ↗